View Larger Image Fall 2019 Construction Photos Progress as of late September 2019. Standing on the middle training wall looking west toward the Sutter Buttes. Front loaders are progressing through the area to remove gravel and cobble to increase lateral connectivity on the Lower Yuba River. Front loader tramming gravel and cobble from the training wall to the rock feeder near temporary crossing location By Admin|2019-11-20T08:57:53-08:00November 20th, 2019| Share This Story, Choose Your Platform! FacebookTwitterRedditLinkedInTumblrPinterestVkEmail Related Posts Hallwood Phase 3/4 Update Gallery Hallwood Phase 3/4 Update Phase 1 Updates for 2021 Gallery Phase 1 Updates for 2021 Phase 2 — Complete! Gallery Phase 2 — Complete! Salmonids in the Side Channels Gallery Salmonids in the Side Channels Phase 2 Starts; River Closes Gallery Phase 2 Starts; River Closes